Framing Continues

This week, Matt and his crew continued to frame.  The bottom plate was bolted to the slab, and the TJI joists were installed.

Click here to view the entire Nauhaus Prototype Construction Chronology.

Detail of Bottom Plate at Termite Barrier
Detail of Bottom Plate at Termite Barrier
The bottom plate is bolted to the AAC through the Advantek.
The bottom plate is bolted to the AAC through the Advantek.
North wall framing with termite barrier visible.
North wall framing with termite barrier visible.
The 2nd floor structure starts with 16" TJIs.
The second floor structure starts with 16" TJIs.
East and North Framing with Rim Band on Top
East and North Framing with Rim Band on Top


6 Responses

  1. …Links

    […]Great weblog right here! Additionally your website rather a lot up very fast![…]

  2. Find more there:

    […]The total glance of your site is great, let smartly as the content![…]

  3. …Recommended websites

    […]Wow, wonderful blog layout! How long have you been blogging for?[…]

  4. transformery-posledniy-rycar-2017

    transformery-posledniy-rycar-2017

  5. kinogomovie

    kinogomovie

  6. tubepatrol.net

    tubepatrol.net

Leave a Reply