Building Science Corporation radon piping detail:

Tags: Chapter 5 - Siting, radon
This entry was posted
on Monday, February 16th, 2009 at 9:40 pm by Seldom and is filed under Architecture, Foundation Systems.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.
[...] the vapor barrier was laid in the trenches. The concrete footers will be poured on top. Radon pipes were installed for future venting if necessary, and greywater pipes were stubbed-out in hopes that [...]