Framing and Drainage

October 30th, 2009 by snugganut

Today the framing of the second floor began, and measures were taken to provide proper drainage from the building.

Click here to view the entire Nauhaus Prototype Construction Chronology.

Tim uses a custom-made tool to measure for the Hemcrete.

Tim uses a custom tool to measure for Hemcrete.

David Madera stopped by to discuss Hemcrete.

David Madera stopped by to discuss Hemcrete.

A strip drain is placed at the bottom of each wall.

A strip drain is placed at the bottom of each wall.

Gravel is shoveled into the Eastern trench.

Gravel is shoveled into the Eastern trench.

East Wall

Wast Wall Framing

Share

Permaflow P-Trap

February 26th, 2009 by Seldom

$45 vs about $5 for a standard PVC P-trap.

PF Waterworks